{"help": "https://data.gov.hk/en-data/api/3/action/help_show?name=package_show", "success": true, "result": {"author": null, "author_email": null, "creator_user_id": "77dc1126-bc02-45e6-a89b-bf2c5ae85737", "id": "0c005e9b-c890-40e2-a266-461d87c3026d", "isopen": false, "license_id": null, "license_title": null, "maintainer": "General Enquiries", "maintainer_email": "plbenq@devb.gov.hk", "maintainer_phone": "3509 8800", "metadata_created": "2023-03-02T18:18:54.887713", "metadata_modified": "2023-03-02T18:18:55.326221", "name": "hk-devb-house-house", "notes": "Sites for Public Housing Development Estimated to be Completed from 2028-29 to 2032-33 (Position as at September 2022): Sites for public housing development expected for completion in the second five-year period are mostly still at the planning, engineering or architectural design stage. This dataset sets out the estimated land availability years for these sites under the current work programme.", "num_resources": 1, "num_tags": 0, "organization": {"id": "44a43c13-3b55-4c47-adab-17bafd258f2a", "name": "hk-devb", "title": "Development Bureau", "type": "organization", "description": "", "image_url": "https://data.gov.hk/filestore/provider-images/hk-devb.png", "created": "2021-07-02T10:54:47.453148", "is_organization": true, "approval_status": "approved", "state": "active"}, "owner_org": "44a43c13-3b55-4c47-adab-17bafd258f2a", "private": false, "state": "active", "title": "Sites for Public Housing Development Estimated to be Completed in the 6th to 10th Years Under the Long Term Housing Strategy", "type": "dataset", "update_frequency": "Yearly", "url": null, "version": null, "groups": [{"description": "", "display_name": "Development, Geography and Land Information", "id": "837c588b-96a1-4338-b0a2-e91e83ace5a5", "image_display_url": "", "name": "development", "title": "Development, Geography and Land Information"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2023-03-02T18:18:55.334781", "dateCreated": "2022-12-13", "dateModified": "2023-03-01", "datePublished": "2023-03-01", "description": "Sites for Public Housing Development Estimated to be Completed from 2028-29 to 2032-33 (Position as at September 2022): Sites for public housing development expected for completion in the second five-year period are mostly still at the planning, engineering or architectural design stage. This dataset sets out the estimated land availability years for these sites under the current work programme.", "format": "API", "hash": "", "id": "42427939-e2cc-4021-929f-bc9604f27420", "inLanguage": "en, zh-Hant, zh-Hans", "is_api": "Y", "last_modified": null, "metadata_modified": "2023-03-02T18:18:55.330615", "mimetype": null, "mimetype_inner": null, "name": "Sites for Public Housing Development Estimated to be Completed in the 6th to 10th Years Under the Long Term Housing Strategy", "package_id": "0c005e9b-c890-40e2-a266-461d87c3026d", "position": 0, "resource_type": null, "shared_id": "b14da686b92611ed9cc30a58c0a84bb4", "size": null, "state": "active", "url": "https://portal.csdi.gov.hk/geoportal/?datasetId=devb_plb_rcd_1670236864007_29270", "url_type": null}], "tags": [], "relationships_as_subject": [], "relationships_as_object": []}}